Home / Workflows / Build a paver patio bid
Trades Estimatingintermediate3-step workflow~18 min

Build a paver patio bid

Size the paver count and base material for a patio, factor in labor burden, then turn it into a bid price.

Workflow

Step 1 of 3

Paver Calculator

Calculate paver count and base material for a patio area.

paver({"shape": "rectangle", "base_depth_in": 4})
Step 2 of 3

Labor Burden Calculator

Load the true hourly labor cost including burden.

labor_burden({"base_wage": 35})
Step 3 of 3

Contractor Bid Estimator

Combine material and burdened labor into a final bid.

bid_estimator({"material_cost": 100, "labor_hours": 100, "labor_rate": 0.07})

Install

One command wires up every tool below for Claude Code:

claude mcp add --transport http wingman https://wingmanprotocol.com/mcp

Claude Desktop, Cursor and Continue configs are on /install. A free key (500 calls/month, no card) is on /pricing; beyond that it is x402 pay-per-call in USDC on Base.