Home / Workflows / Size asphalt and draw a payment schedule
Trades Estimatingintermediate3-step workflow~18 min

Size asphalt and draw a payment schedule

Calculate an asphalt paving job's material needs, build the progress-draw schedule, then aggregate the full takeoff.

Workflow

Step 1 of 3

Asphalt Calculator

Calculate asphalt tonnage and cost for a paving area.

asphalt({"length": 20, "width": 12, "depth_in": 4})
Step 2 of 3

Construction Draw Schedule Calculator

Build a construction-draw payment schedule for the job.

draw_schedule({"contract_amount": 1000})
Step 3 of 3

Bill of Materials / Takeoff Aggregator

Aggregate the paving materials into one takeoff.

bill_of_materials({"items": []})

Install

One command wires up every tool below for Claude Code:

claude mcp add --transport http wingman https://wingmanprotocol.com/mcp

Claude Desktop, Cursor and Continue configs are on /install. A free key (500 calls/month, no card) is on /pricing; beyond that it is x402 pay-per-call in USDC on Base.