Housekeeping & General Site Conditions (15)
Walkways and access paths clear of debris
Scrap material removed routinely
Trash containers available and not overfilled
Nails or sharp hazards removed or bent over
Wet / slippery areas identified and corrected
Adequate lighting provided in active work areas
Site fencing or barriers intact where required
Visitor access controlled
Portable toilets clean and stocked
Drinking water available and sanitary
Material staging areas defined
No trip hazards at cords or hoses
Floor openings protected or covered
Housekeeping responsibility assigned
Corrective actions documented for open items
Personal Protective Equipment (12)
Hard hats worn where overhead hazards exist
Safety glasses available and used
Face shields used for grinding / cutting
Hearing protection available in noisy zones
Gloves matched to task
High-visibility vests worn near traffic / equipment
Respiratory protection used when required
PPE in good condition
Damaged PPE removed from service
Crew trained on PPE requirements
Special task PPE identified in JHA
Visitors issued required PPE
Fall Protection (20)
Workers protected at unprotected sides over 6 feet
Guardrails installed where practical
Top rails at proper height
Midrails installed
Toe boards used where falling object hazard exists
Floor opening covers secured and labeled
Roof edge protection in place
Warning lines set correctly where allowed
PFAS inspected before use
Harnesses fit properly
Lanyards free of damage
Anchorage points rated and approved
Horizontal lifelines engineered if used
Rescue plan discussed
Leading-edge work evaluated
Hole covers support intended load
Skylights protected
Scaffold platforms fully decked
Aerial lift tie-off rules followed
Fall protection training current
Ladders & Scaffolding (18)
Ladders inspected before use
Extension ladders extend 3 feet above landing
Ladders set on stable footing
Ladders secured when required
No damaged ladders in use
Three points of contact maintained
Stepladders fully opened
Top step not used improperly
Scaffold base plates / mudsills in place
Scaffold plumb and level
Guardrails installed on scaffold
Access ladder provided for scaffold
Scaffold ties / braces installed
Casters locked on rolling scaffold
Load limits posted or understood
Platforms free of excess material
Competent person inspections performed
Tagging system current
Excavation & Trenching (15)
Competent person assigned
Daily trench inspection performed
Protective system selected for depth / soil type
Spoil piles set back from edge
Access ladder within required distance
Standing water controlled
Utilities located before digging
Atmosphere tested where required
Heavy equipment kept back from edge
Barricades installed around open excavation
Ingress / egress maintained
Adjacent structures evaluated
Excavation permit obtained if required
Rain event reassessment completed
Trench boxes in good condition
Electrical Safety (20)
Temporary power installed safely
Panels have covers and dead fronts
Extension cords free of damage
GFCI protection used
Cords not run through standing water
Open knockouts covered
Tools grounded or double insulated
Lockout / tagout used where required
Generators grounded per manufacturer
No energized work without authorization
Lighting strings protected from damage
Panel directories legible
Temporary receptacles weather-protected
Cords protected from vehicle traffic
No daisy-chained power strips
Battery charging areas ventilated
Overhead line clearance maintained
Damaged fixtures tagged out
Qualified personnel perform electrical work
Arc flash / shock boundaries respected
Hand & Power Tools (15)
Tools inspected before use
Guards installed on saws and grinders
Defective tools removed from service
Trigger locks not defeated
Appropriate blade / bit installed
Compressed air used safely
Powder-actuated tool operators trained
Tool cords not used to carry tool
Nail guns set for safe operation
Tool boxes stored neatly
Fuel-powered tools cooled before refueling
Cutting stations stable
Manufacturer instructions available
Dust collection or suppression used
Tool-specific PPE provided
Materials Handling & Storage (12)
Material stacked stable and level
Flammable materials stored properly
Compressed gas cylinders secured
Forklift paths maintained
Rigging gear inspected
Lifting plans used for heavy picks
Sheet goods stored to prevent tipping
Manual lifting risks controlled
Aisles kept clear in laydown area
Chemicals labeled
SDS available on site
Waste segregated where required
Fire Prevention (10)
Extinguishers available and charged
Hot work permit used when required
Combustibles separated from ignition sources
No-smoking areas marked
Temporary heaters safely located
Fuel storage labeled
Emergency exits kept clear
Fire watch assigned when needed
Spark containment used
Crew knows extinguisher locations
Emergency Response (8)
Emergency contact list posted
First aid kit stocked
Incident reporting procedure known
Nearest hospital / urgent care identified
Evacuation route communicated
Assembly point established
Severe weather plan discussed
CPR / first-aid responder identified