16-Week Construction Schedule Template

You've purchased this product. Print or save as PDF anytime.

16-Week Construction Schedule

Gantt-style planning grid — Weeks 1 through 8
Premium Printable
Page 1 of 2
Project Name
Client / Owner
Superintendent
Notice to Proceed
Target Completion
Critical pathOptional / floatInspectionOwner milestone
Trade / PhaseWeek 1Week 2Week 3Week 4Week 5Week 6Week 7Week 8
SFSFSFSFSFSFSFSF
01 Demolition
02 Site prep / excavation
03 Foundation
04 Rough framing
05 Roof framing
06 Roofing
07 Rough plumbing
08 Rough electrical
09 Rough HVAC
10 Insulation
11 Drywall hang
12 Drywall finish
13 Prime / paint
14 Flooring
15 Cabinets
16 Trim / millwork
17 Tile
18 Plumbing trim
19 Electrical trim
20 HVAC trim
21 Appliances
22 Hardware / fixtures
23 Painting final
24 Punch list
25 Inspections
26 Substantial completion
27 Final cleanup
28 Owner walk-through
29 Final payment
30 Warranty period begins

16-Week Construction Schedule

Weeks 9 through 16 with milestones and contingency notes
Premium Printable
Page 2 of 2
Project Name
Prepared By
Revision Date
Weather Allowance
Permit Status
Critical pathOptional / floatInspectionOwner milestone
Trade / PhaseWeek 9Week 10Week 11Week 12Week 13Week 14Week 15Week 16
SFSFSFSFSFSFSFSF
01 Demolition
02 Site prep / excavation
03 Foundation
04 Rough framing
05 Roof framing
06 Roofing
07 Rough plumbing
08 Rough electrical
09 Rough HVAC
10 Insulation
11 Drywall hang
12 Drywall finish
13 Prime / paint
14 Flooring
15 Cabinets
16 Trim / millwork
17 Tile
18 Plumbing trim
19 Electrical trim
20 HVAC trim
21 Appliances
22 Hardware / fixtures
23 Painting final
24 Punch list
25 Inspections
26 Substantial completion
27 Final cleanup
28 Owner walk-through
29 Final payment
30 Warranty period begins

Key milestones

  • Foundation inspection complete
  • Rough MEP inspection complete
  • Dry-in achieved
  • Substantial completion achieved

Critical path notes

  • Protect framing, MEP rough-in, and inspections from resequencing.
  • Order long-lead windows, cabinets, and specialty fixtures early.
  • Track city inspection lead times weekly.

Weather / inspection contingency

  • Reserve float for rain, concrete cure time, and utility delays.
  • Confirm inspection sequence before each milestone handoff.
  • Document owner selections that impact finish trades.

Scheduling software to replace the spreadsheet

Buildertrend Gantt Scheduling
Drag and drop Gantt, sub notifications, weather delay tracking.
Try Free →
Jobber Job Scheduling and Dispatch
Visual dispatch board for crews and subs. $200 affiliate commission.
Try Free →
Asana Project Timeline
Visual Gantt timeline. Free plan covers small teams.
Try Free →
36x24 Magnetic Whiteboard Calendar →
Office schedule at a glance
Laminated Project Timeline Chart →
Stick it in the site trailer

* As an Amazon Associate and software affiliate, Wingman Protocol earns a small commission from qualifying purchases at no extra cost to you. We only recommend tools and software researched or used on actual job sites.